Thursday 22 December 2011

Riveting afternoon

A bit of a belated entry but the engine room front/side  bulkheads are now riveted in place. With John on the furnace placing the rivets and Graeme on the air hammer I was left with the unenviable job of holding the rivets in place while Graeme hammered the ends round. Apparently we have done the easy bit, next up the engine room roof!

First picture showing engine room frame which will be immediately in front of the engine room door.

Engine room bulkhead from the inside.
Engine room bulkhead from the outside.

No comments:

Post a Comment